The house demolition is scheduled for this upcoming Tuesday (August 3, 2010). To obtain a lower demolition price, we signed over the salvage rights when we contracted with the demolition company. The demolition company wasted no time. To date, the demolition company has salvaged the brick, wood floors, HVAC system, electrical components, doors, plumbing fixtures, and stove.
When we drove by, Reese said, "They are taking off the brick; that is crazy!". I am pretty sure she was mimicking Adrienne who has been saying how crazy the house looks.
Here is a picture from the side of the house (you can see the guts of the chimney).
Picture from back side of house (notice the missing electrical/fuse box).
Picture looking at front of house.
Picture looking at the back door.
Picture looking at the back patio deck.
Picture looking in dining room.
Picture in dining room looking up at attic (looks like the hole was made to lower the HVAC system into the dining room).
Looking from kitchen into dining room and living room.
Picture looking into dining room (notice how the wood floors were pulled up).
No comments:
Post a Comment